Skip to content
Sku.Estimator
How it works Live BOM Table Live Cost HUD AI Estimator Punching Tool Component Library Source Checker Colour System Pack Rules Documents & PDFs Fail Safes Pricing Help & setup Contact Start free trial →
Documents & PDFs

One model.
Four documents.

Change the model — the PO, quote, estimate and site BOM rebuild themselves.

Purchase Order
Customer Quote
Estimate
BOM
One pass, four outputs

The model fans out into every document you need.

project.skp
Purchase Order
SupplierSteelwright
C25019 Purlin×48
Z20015 Girt×36
Trimdek 0.42×112
TOTAL  $68,352.49
Customer Quote
TO: Sample Homes Pty Ltd
$48,200 inc GST
30% / 40% / 30%
Payment schedule
Estimate
Steelwright$21,380
Ironhaus$9,410
Rollwright$5,770
Cost  $36,560
BOM
C2501948
Z2001536
TD042112
M16BOLT240
site copy, no pricing
Same pipeline. One pass. Four outputs.
1

Read the model once

Every dyc: attribute, read in one pass.

2

Resolve through the pipeline

Colours, pack rules, overrides, markup — one shared order.

3

Format per template

Each template picks columns and headline, renders to A4 PDF.

In the real plugin · sample data

These are the real documents.

A saved purchase order PDF with one section per supplier and a GST summary by supplier
A saved purchase order: one section per supplier, then a GST summary.
Template editor showing available attributes and the columns chosen for the document
The template editor: pick the columns, drag to reorder, tick which ones total.
The template engine

Every document is a template.

  • ✓

    Pick the columns

    Any dyc: attribute can be a PDF column.

  • ✓

    Group however you want

    Supplier, category, length — subtotals roll up automatically.

  • ✓

    Set the headline metric

    Cost, weight or linear metres — one number headlines the document.

  • ✓

    Standing charges & payment schedules

    Fixed fees add themselves; the last payment stage takes the balance, so the schedule always adds up to the quote total.

Template Editor — Customer Quote
Columns Grouping Headline Payment Closing
Columns — drag to reorder
⋮⋮Itemcodeidentity
⋮⋮Nameidentity
⋮⋮Qtysum
⋮⋮Unitidentity
⋮⋮Priceidentity
⋮⋮Costsum
⋮⋮Weightsum
identity — rows merge when these match sum — these add up across merged rows
Payment schedule
Stage · Percent · Amount
Deposit20%$9,640
Pre-fab30%$14,460
Pre-delivery40%$19,280
Final10%$4,820
TOTAL100%$48,200
✓ Schedule valid

Branded A4 PDF — repeating headers, page numbers, acceptance block, T&Cs.

Purchase Order

Send it to the supplier

Real itemcodes, pack quantities, net pricing.

supplier · cost · net pricing
Customer Quote

Send it to the client

Branded and marked-up, total inc GST.

markup · payment schedule · T&Cs
Estimate

Keep it for yourself

True cost by supplier and category, for your eyes only.

internal · cost · weight
BOM

Hand it to the site

Itemcode and quantity — the crew's build sheet.

itemcode · qty · no pricing
The spreadsheet way
  • Four documents re-typed by hand.
  • Documents silently fall out of sync.
  • Percentages that don't sum to 100%.
  • Errors the client finds first.
The SkuEstimator way
  • Every document is generated, never copied.
  • Change the model — every document rebuilds.
  • Markup applies once, automatically.
  • Payment stages always add up to the total.
Pricing

One plugin. Every tool included.

Every module included — no add-ons, no tiers. A$99 per month + GST, with a 3-day free trial.

3-day free trial

SkuEstimator

One plan for estimators modelling with attributed dynamic components

A$99/ month + GST
Start free trial
  • Every module included
  • Branded PDF export
  • Supplier CSV price sync
  • A direct line to the developer

Australian-built, local-first · Pricing details →